Dell
DNDNS-200 · Question #56
DNDNS-200 Question #56: Real Exam Question with Answer & Explanation
Sign in or unlock DNDNS-200 to reveal the answer and full explanation for question #56. The question stem and answer options stay visible for context.
Question
A customer wants to convert S-Series stacked switches to a VLT configuration to maintain port-channels from the customer's server. The customer's S-Series stack currently uses IEEE 802.1D. The customer wants to upgrade to a faster converging protocol. The servers that connect to the stack use static port-channels, but the customer wants to use LACP going forward. The customer has approached a maintenance window for the weekend to make these changes. A network engineer has been given the following plan: - Obtain the appropriate S-Series code version from the customer - Upgrade the firmware of the S-Series switches - Convert to the VLT domain in the stack - Configure the port-channels down to the customer's servers - Utilize all existing cabling to proceed with the plan Which two pieces of information does the engineer need to proceed? (Choose two.)
Options
- ATime-out value for ARP-cache.
- BNew 802.1s bridge priority after the cutover.
- CRequirement of IEEE 802.1w for VLT Support.
- DVersion of VLT that is required to meet IEEE 802.3ad LAG.
Unlock DNDNS-200 to see the answer
You've previewed enough free DNDNS-200 questions. Unlock DNDNS-200 for full answers, explanations, the timed quiz mode, progress tracking, and the master PDF. Question stem and options stay visible so you can still see what's on the exam.