nerdexam
Dell

DNDNS-200 · Question #56

DNDNS-200 Question #56: Real Exam Question with Answer & Explanation

Sign in or unlock DNDNS-200 to reveal the answer and full explanation for question #56. The question stem and answer options stay visible for context.

Question

A customer wants to convert S-Series stacked switches to a VLT configuration to maintain port-channels from the customer's server. The customer's S-Series stack currently uses IEEE 802.1D. The customer wants to upgrade to a faster converging protocol. The servers that connect to the stack use static port-channels, but the customer wants to use LACP going forward. The customer has approached a maintenance window for the weekend to make these changes. A network engineer has been given the following plan: - Obtain the appropriate S-Series code version from the customer - Upgrade the firmware of the S-Series switches - Convert to the VLT domain in the stack - Configure the port-channels down to the customer's servers - Utilize all existing cabling to proceed with the plan Which two pieces of information does the engineer need to proceed? (Choose two.)

Options

  • ATime-out value for ARP-cache.
  • BNew 802.1s bridge priority after the cutover.
  • CRequirement of IEEE 802.1w for VLT Support.
  • DVersion of VLT that is required to meet IEEE 802.3ad LAG.

Unlock DNDNS-200 to see the answer

You've previewed enough free DNDNS-200 questions. Unlock DNDNS-200 for full answers, explanations, the timed quiz mode, progress tracking, and the master PDF. Question stem and options stay visible so you can still see what's on the exam.

Full DNDNS-200 Practice