For a design-bid (tender)-build project, the final step for determining the owner's costs for an AV system is
The correct answer is D. ensuring the equipment specification is ready for bid. See the full explanation below for the reasoning.
AV Installation
Question
For a design-bid (tender)-build project, the final step for determining the owner's costs for an AV system is
Options
- Aselecting an Integrator.
- Bperforming a needs analysis.
- Chaving the owner approve the design.
- Densuring the equipment specification is ready for bid.
How the community answered
(15 responses)- B7% (1)
- C13% (2)
- D80% (12)
Topics
#design-bid-build#equipment specification#bidding process#project delivery