The correct answer is A. RTO. Recovery Time Objective (RTO) is the maximum tolerable duration of time within which a business process or system must be restored after a disaster to avoid unacceptable consequences.
Question
Which of the following is the duration of time and a service level within which a business process must be restored after a disaster in order to avoid unacceptable consequences associated with a break in business continuity?
Options
- ARTO
- BRTA
- CRPO
- DRCO
How the community answered
(19 responses)- A84% (16)
- B11% (2)
- C5% (1)
Why each option
Recovery Time Objective (RTO) is the maximum tolerable duration of time within which a business process or system must be restored after a disaster to avoid unacceptable consequences.
Recovery Time Objective (RTO) defines the maximum allowable time for restoring a business function or system to an operational state after an incident to avoid unacceptable consequences, focusing on the duration of disruption and downtime.
RTA (Real Time Adjudication) is not a standard disaster recovery metric and typically refers to immediate decision-making processes.
Recovery Point Objective (RPO) defines the maximum tolerable amount of data loss, measured in time, from the point of failure back to the last valid data backup or replication point.
RCO (Recovery Cost Objective) is not a standard disaster recovery metric; it would refer to cost considerations rather than a specific time or data loss target.
Concept tested: Disaster recovery metrics - RTO
Source: https://learn.microsoft.com/en-us/azure/architecture/resiliency/recovery-objectives