ASQ
CRE · Question #284
CRE Question #284: Real Exam Question with Answer & Explanation
Sign in or unlock CRE to reveal the answer and full explanation for question #284. The question stem and answer options stay visible for context.
Question
A high incidence of failures has developed during aircraft acceptance testing. The identified failure is that an instrument panel light has malfunctioned on 6 of the last 10 aircraft tested. This problem needs to be investigated and a Failure Reporting and Corrective Action System (FRACAS) needs to be completed without stopping aircraft production. If the cause of the failure is determined to be a faulty subassembly manufactured only by a single supplier, and this situation is threatening to shut down aircraft production, the next step should be to
Options
- AVisit the supplier to assist in determining the root cause of the problem.
- BInitiate a supplier corrective action and return all of the unsorted inventory.
- CIssue a Government and Industry Data Exchange Program (GIDEP) alert.
- DUpdate the inspection instruction and retrain receiving inspection.
Unlock CRE to see the answer
You've previewed enough free CRE questions. Unlock CRE for full answers, explanations, the timed quiz mode, progress tracking, and the master PDF. Question stem and options stay visible so you can still see what's on the exam.