C_TSCM62_66 · Question #77

In a sales order, the schedule line category CP was found. The sales document item contains the following information: The MRP type from the material master is M0 and the relevant item category is…

The correct answer is A. The schedule line category was determined by the system in the assignment table with only the. See the full explanation below for the reasoning.

Question

In a sales order, the schedule line category CP was found. The sales document item contains the following information: The MRP type from the material master is M0 and the relevant item category is TAN. The assignment table for schedule line categories has no entry for the combination of TAN and M0. How was the schedule line category determined in this case?

Options

  • AThe schedule line category was determined by the system in the assignment table with only the
  • BThe schedule line category was determined by the system in the assignment table using the item
  • CThe system used the default schedule line category assignment table with the item category and
  • DThe system used the default schedule line category from the Customizing of the sales document

How the community answered

(55 responses)
  • A
    71% (39)
  • B
    4% (2)
  • C
    7% (4)
  • D
    18% (10)

Community Discussion

No community discussion yet for this question.

Full C_TSCM62_66 Practice