C_TSCM42_66 · Question #25
Which of the following are characteristics of ECC master production scheduling (MPS)? (Choose three)
The correct answer is C. Non-MPS items can be taken into consideration by an MPS run. D. MPS items can be defined on plant level. E. MPS items can be defined on MRP area level. See the full explanation below for the reasoning.
Question
Which of the following are characteristics of ECC master production scheduling (MPS)? (Choose three)
Options
- AMPS items are planned in a standard MRP run.
- BThe planning of MPS and non-MPS items is always carried out in one planning run.
- CNon-MPS items can be taken into consideration by an MPS run.
- DMPS items can be defined on plant level.
- EMPS items can be defined on MRP area level.
How the community answered
(17 responses)- A12% (2)
- B6% (1)
- C82% (14)