C_TFIN22_65 · Question #63
How do you receive the internal activities in the material cost estimate using a logistic quantity structure?
The correct answer is B. Assign a cost center and its activities in the work center of the routing operation. In material costing with a logistic quantity structure, internal activities are integrated by assigning a cost center and its activities to the work center used in a routing operation.
Question
How do you receive the internal activities in the material cost estimate using a logistic quantity structure?
Options
- AAssign the responsible cost center and its activities directly to the routing header.
- BAssign a cost center and its activities in the work center of the routing operation.
- CAssign a cost element with type 43 (internal activity allocation) to the routing operation.
- DAssign a cost center and its activities to the bill of material.
How the community answered
(36 responses)- A6% (2)
- B89% (32)
- C3% (1)
- D3% (1)
Why each option
In material costing with a logistic quantity structure, internal activities are integrated by assigning a cost center and its activities to the work center used in a routing operation.
Assigning to the routing header is too general and does not specify which activities apply to which specific operation; activities are generally consumed at the operation level.
In SAP, internal activities (like labor or machine time) are costed by linking them to work centers, which are then assigned to operations within a routing. The work center specifies the responsible cost center and the activity types performed, allowing the system to calculate the cost of these activities in the material cost estimate based on activity rates.
While cost element type 43 is for internal activity allocation, the mechanism for receiving these activities in the material cost estimate through a logistic quantity structure is via the work center and its assignment in the routing operation, not directly assigning the cost element to the operation.
A bill of material (BOM) specifies the raw materials and components, not internal activities; activities are defined in routings.
Concept tested: SAP Material Costing Internal Activities Integration
Source: https://help.sap.com/docs/SAP_S4HANA_ON-PREMISE/f3769910a30b4278ad0768b7501a3013/0c897f52f36f4d3de10000000a441753.html
Topics
Community Discussion
No community discussion yet for this question.