Question
Goods receipt into stock in quality inspection can be preplanned in which of thefollowing. (Choose all that apply)
Options
- AIn the Material master
- BOn the GR
- COn the PO
- DOn the Vendor Info record
Unlock C_TERP10_65 to see the answer