A customer is managing a Power 720 with dual VIO Servers with a 7310-CR4 HMC. A PS701 blade which requires Active Memory Expansion (AME) will be added to the environment. Existing resources must be…

The correct answer is C. The HMC must have a minimum code level of V7R7.6.0. See the full explanation below for the reasoning.

Question

A customer is managing a Power 720 with dual VIO Servers with a 7310-CR4 HMC. A PS701 blade which requires Active Memory Expansion (AME) will be added to the environment. Existing resources must be reused as much as possible. Which of the following supports the configuration?

Options

  • AA Flex System Manager (FSM) is required.
  • BAn HMC 7042-CR7 minimum needs to be added.
  • CThe HMC must have a minimum code level of V7R7.6.0.
  • DFirmware of the blade and IVM must be at the latest level.

How the community answered

(24 responses)
  • A
    8% (2)
  • B
    17% (4)
  • C
    71% (17)
  • D
    4% (1)