Testing should be stopped when:

The correct answer is E. It depends on the risks for the system being tested. See the full explanation below for the reasoning.

Question

Testing should be stopped when:

Options

  • AAll the planned tests have been run
  • BTime has run out
  • CAll faults have been fixed correctly
  • DBoth A and C
  • EIt depends on the risks for the system being tested

How the community answered

(34 responses)
  • A
    15% (5)
  • B
    9% (3)
  • C
    3% (1)
  • E
    74% (25)