BCP-620 · Question #84
Nextair Corporation plans to keep running BlackBerry Enterprise Server software version 4.1.6 in New York and install version 5.0 in Toronto. They plan on performing a phased migration between the…
The correct answer is B. It allows time for testing beforemigrating all BlackBerry device users. A phased migration - running the old version (4.1.6) in New York while piloting the new version (5.0) in Toronto - gives the IT team time to validate BES 5.0 behavior, identify issues, and refine the process before committing all users, making B correct. Why the distractors are…
Question
Nextair Corporation plans to keep running BlackBerry Enterprise Server software version 4.1.6 in New York and install version 5.0 in Toronto. They plan on performing a phased migration between the two sites. Both BlackBerry Enterprise Server instances will use their own Microsoft SQL Server hosted in their respective location. What is an advantage of this upgrade? (Choose one)
Options
- ABoth BlackBerry Enterprise Server instances can be managed in the same BlackBerry Domain
- BIt allows time for testing beforemigrating all BlackBerry device users
- CBlackBerry devices will not require new service books
- DThe cost of an additional SRP Identifier is saved
How the community answered
(35 responses)- A3% (1)
- B74% (26)
- C9% (3)
- D14% (5)
Explanation
A phased migration - running the old version (4.1.6) in New York while piloting the new version (5.0) in Toronto - gives the IT team time to validate BES 5.0 behavior, identify issues, and refine the process before committing all users, making B correct.
Why the distractors are wrong:
- A is incorrect because the two BES instances run in separate BlackBerry Domains (each has its own SQL Server in its own location); a shared domain requires a shared database.
- C is incorrect because upgrading from BES 4.1.6 to 5.0 does require new service books to be pushed to devices to reflect the new server configuration.
- D is incorrect because each BES instance requires its own SRP (Server Routing Protocol) Identifier - a second instance means a second SRP ID cost, not a saving.
Memory tip: Think of a phased migration as a "pilot program" - the whole point is controlled testing before full rollout, which maps directly to answer B. If you see "phased" in a migration question, think testing and risk reduction.