nerdexam
Microsoft

AZ-120 · Question #276

You have an on-premises SAP Enterprise Central Component (ECC) landscape that is hosted on servers that run Windows Server and uses an Oracle database. You need to migrate the landscape to SAP…

The correct answer is B. Software Update Manager (SUM). Software Update Manager (SUM) with the Database Migration Option (DMO) is the correct tool because it combines the SAP system conversion (ECC → S/4HANA) and the heterogeneous database migration (Oracle → SAP HANA) into a single procedure. This combined approach is specifically…

Migrate SAP workloads to Azure

Question

You have an on-premises SAP Enterprise Central Component (ECC) landscape that is hosted on servers that run Windows Server and uses an Oracle database. You need to migrate the landscape to SAP S/4HANA on Azure virtual machines. The solution must minimize downtime. What should you use?

Options

  • AAzure Site Recovery
  • BSoftware Update Manager (SUM)
  • CSoftware Provisioning Manager (SWPM)
  • DAzure Migrate

How the community answered

(25 responses)
  • A
    4% (1)
  • B
    80% (20)
  • C
    8% (2)
  • D
    8% (2)

Explanation

Software Update Manager (SUM) with the Database Migration Option (DMO) is the correct tool because it combines the SAP system conversion (ECC → S/4HANA) and the heterogeneous database migration (Oracle → SAP HANA) into a single procedure. This combined approach is specifically designed to minimize downtime compared to running separate migration steps. SUM DMO can also include a "System Move" option, enabling relocation to new Azure VMs in the same pass.

Why the distractors are wrong:

  • A. Azure Site Recovery replicates VMs for disaster recovery/lift-and-shift scenarios - it has no capability to convert SAP application versions or swap underlying databases.
  • C. SWPM handles SAP installations and system copies but is used for provisioning new systems, not for the combined in-place conversion + DB migration that minimizes downtime.
  • D. Azure Migrate assesses and moves on-premises workloads to Azure (infrastructure-level), but it cannot perform the SAP application conversion from ECC to S/4HANA or migrate the Oracle database to HANA.

Memory tip: SUM = Single-step Upgrade + Migration. Whenever you see ECC → S/4HANA plus a database change (Oracle → HANA) with a downtime constraint, SUM DMO is the answer - it's the only SAP-native tool that collapses both transformations into one minimized-downtime operation.

Topics

#SAP ECC to S/4HANA#Software Update Manager#migration downtime#Oracle database

Community Discussion

No community discussion yet for this question.

Full AZ-120 Practice