You need to implement the planned reporting changes after the Reporting server in the London office is deployed. What should you do?

The correct answer is D. From the Operations Manager console, configure the Reporting settings. After deploying a new Reporting server, the Reporting settings in the Operations Manager console must be configured to point OpsMgr to the new server.

Configuring and Deploying System Center 2012 - Operations Manager

Question

You need to implement the planned reporting changes after the Reporting server in the London office is deployed. What should you do?

Options

  • AFrom the Operations Manager console, configure the Security settings.
  • BFrom the Operations Manager Shell, run the Enable-SCOMOperationalDataReportingcmdlet.
  • CFrom Microsoft SQL Server Reporting Services (SSRS), upload a report model (.smdl) file and
  • DFrom the Operations Manager console, configure the Reporting settings.

How the community answered

(64 responses)
  • A
    2% (1)
  • B
    5% (3)
  • C
    3% (2)
  • D
    91% (58)

Why each option

After deploying a new Reporting server, the Reporting settings in the Operations Manager console must be configured to point OpsMgr to the new server.

AFrom the Operations Manager console, configure the Security settings.

The Security settings in the Operations Manager console control role-based access and account permissions, not the registration of a reporting server endpoint.

BFrom the Operations Manager Shell, run the Enable-SCOMOperationalDataReportingcmdlet.

The Enable-SCOMOperationalDataReporting cmdlet enables the flow of operational data to reporting but does not configure the connection to a newly deployed Reporting server location.

CFrom Microsoft SQL Server Reporting Services (SSRS), upload a report model (.smdl) file and

Uploading a report model (.smdl) file directly to SSRS bypasses the Operations Manager integration layer and does not register the server within the OpsMgr console Reporting settings.

DFrom the Operations Manager console, configure the Reporting settings.Correct

The Operations Manager console includes a dedicated Reporting settings section under Administration where administrators register and configure the SQL Server Reporting Services URL for the reporting server. Configuring these settings after deploying the London Reporting server connects OpsMgr to the new SSRS instance so reports can be published and accessed. This is the standard post-deployment step required to make a new reporting server operational within OpsMgr.

Concept tested: Configuring Operations Manager Reporting server settings post-deployment

Source: https://learn.microsoft.com/en-us/system-center/scom/deploy-install-reporting-server?view=sc-om-2019