nerdexam
Microsoft

70-243 · Question #148

You have a deployment of a system centre 2012 R2 configuration manager services pack 1 (SP1). Your company has three different hardware builds for client computers. You use the operating system…

The correct answer is C. Manually create a reference system for each hardware build, and then capture the images. ConfigMgr 2012 SP1 involvesfive general steps (but with some welcome new features) when deploying operating systems. These steps include: Install Prerequisites for OS Deployment Prepare Boot Images Add Operating System Image Define a Task Sequence Deploy a Task Sequence Note…

Managing Operating System Deployment (OSD)

Question

You have a deployment of a system centre 2012 R2 configuration manager services pack 1 (SP1). Your company has three different hardware builds for client computers. You use the operating system deployment feature to deploy windows 7 to the computers. You plan to deploy windows 8.1 by using operating system deployment. The deployments will be used to perform in-place upgrades, operating system refreshes, and bare-metal deployments. You need to identify which method to use to create configuration managers for the deployment. The solution must minimize the number of images. What should you do?

Options

  • AAdd one Configuration Manger operating system image by using Install.wim from the windows 8.1
  • BCreate a build and capture the task sequence for each hardware build.
  • CManually create a reference system for each hardware build, and then capture the images.
  • DCreate one pre-staged media.

How the community answered

(28 responses)
  • A
    14% (4)
  • B
    7% (2)
  • C
    71% (20)
  • D
    7% (2)

Explanation

ConfigMgr 2012 SP1 involvesfive general steps (but with some welcome new features) when deploying operating systems. These steps include: Install Prerequisites for OS Deployment Prepare Boot Images Add Operating System Image Define a Task Sequence Deploy a Task Sequence Note that when deploying a customized operating system image, an additional step is required to build and capture the customized image prior to defining a task sequence to deploy it in Step 4. https://blogs.technet.microsoft.com/keithmayer/2013/02/06/5-steps-to-deploying-windows-8-with- system-center-2012-service-pack-1-migration-and-deployment-part-3-of-19/

Topics

#capture image#reference computer#hardware builds#minimize images

Community Discussion

No community discussion yet for this question.

Full 70-243 Practice