A Virtual Services Platform (VSP) 9000 chassis has the following connections: Four 10GBaseER core connections in ports 3/4 , 3/8, 4/4, 4/8 (9024XL cards) 40 Copper 100BaseT connections for server…

The correct answer is D. Install six SFs in SF modules 1, 2, 3, 4, 5, 6. See the full explanation below for the reasoning.

Question

A Virtual Services Platform (VSP) 9000 chassis has the following connections:

Four 10GBaseER core connections in ports 3/4 , 3/8, 4/4, 4/8 (9024XL cards) 40 Copper 100BaseT connections for server aggregation (9048GT card) How many Switch Fabric (SF) modules need to be installed in the roar of the chassis to ensure that all of the IO cards operate at full performance, even if a single SF modules fails (n + 1 SF redundancy)?

Options

  • AInstall three SFs in St modules 1, 2, 4.
  • BInstall four SFs in SF modules 1, 2, 3, 4.
  • CInstall five SFs in SF modules 1, 2, 3, 4, 5.
  • DInstall six SFs in SF modules 1, 2, 3, 4, 5, 6.

How the community answered

(32 responses)
  • A
    6% (2)
  • B
    3% (1)
  • C
    16% (5)
  • D
    75% (24)