Avaya
6102 · Question #29
6102 Question #29: Real Exam Question with Answer & Explanation
Sign in or unlock 6102 to reveal the answer and full explanation for question #29. The question stem and answer options stay visible for context.
Question
A customer has a stack of Ethernet Routing Switch (ERS) 5698TFD switches, the uplinks to the network core are via two Gigabit uplink ports from the first ERS 5698TFD in the stack to a single virtual services platform (VSP) 9000. The links are not part of a Multi-Link Trunk (MLT) and spanning tree is running. This results in one of the links always being blocked and recovery time unacceptably long when the active uplink fails. They need to have both links active to increase the bandwidth to the core, and at the same time provide better redundancy. What is the preferred Avaya solution for the customer?
Options
- AMove only of the uplink to another ERS 5698TFD in the stack and disable spanning-tree on both uplinks.
- BMove one of the uplinks to another ERS 5698TFD in the stack and enable Equal Cost Multi- Path (ECMP)
- CMove one of the uplinks to another ERS 5698TFD in the stack, configure MLT, and group the two uplinks
- DMove one of the uplinks to another ERS 5698TFD in the stack, and ensure that the uplinks terminate on
Unlock 6102 to see the answer
You've previewed enough free 6102 questions. Unlock 6102 for full answers, explanations, the timed quiz mode, progress tracking, and the master PDF. Question stem and options stay visible so you can still see what's on the exam.