- Question #1Routine Maintenance Procedures
An administrator has a standalone vSphere 8.0 Update 1a deployment that is running with VMware NSX 4.1.0.2 and has to converge the deployment into a new VMware Cloud Foundation (VC...
VCF convergencevSphereNSXmigration - Question #2Troubleshooting Methodologies and Tools
An administrator is troubleshooting intermittent connectivity failures between two workloads connected to NSX VLAN segments using Traceflow. In-band Network Telemetry (INT) has bee...
TraceflowNSXVLAN segmentINT - Question #3System Monitoring and Diagnostics
An administrator is troubleshooting east--west network performance between several virtual machines connected to the same logical segment. The administrator inspects the internal f...
MAC tableESXilogical segmentframe forwarding - Question #4Routine Maintenance Procedures
An administrator has been tasked with providing a networking solution including a Source and Destination NAT for a single Tenant. The tenant is using Centralized Connectivity with...
NATTier-1 GatewayTier-0 GatewayActive-Standby - Question #5Virtual Services Platform 9000 Architecture and Components
An administrator is tasked to configure NSX Federation between separate VMware Cloud Foundation (VCF) Fleets. Which requirement must all sites meet before being added to a Global M...
NSX FederationGlobal ManagerVCFversion requirements - Question #6Problem Isolation and Resolution
A sovereign cloud provider has a VMware Cloud Foundation (VCF) stretched Workload Domain across two data centers (AZ1 and AZ2), where site connectivity via Layer 3 is provided by t...
Edge TEP IP poolAZ deploymentSDDC Manageruplink profile - Question #7Problem Isolation and Resolution
An administrator is troubleshooting a BGP connectivity issue on a Tier-0 Gateway (Active/Active). The Tier-0 has the following configuration: - Uplink VLAN 100: 192.168.100.0/24 -...
BGPTier-0 Gatewaystatic route scopeActive/Active - Question #8Virtual Services Platform 9000 Architecture and Components
Which two requirements are part of the registration process for Local Manager (LM) to a Global Manager (GM) in NSX for centralized management of network and security services acros...
NSX FederationLocal ManagerGlobal Managerregistration - Question #9Problem Isolation and Resolution
An administrator is troubleshooting BGP flapping in a VMware Cloud Foundation (VCF) 9 environment. A Tier-0 Gateway is running in Active/Active mode with two Edge nodes. BFD is ena...
BGP flappingBFDMTU mismatchEdge node - Question #10Problem Isolation and Resolution
In an NSX environment, an administrator is observing low throughput and intermittent congestion between the Tier-0 Gateway and the upstream physical routers. The environment was de...
ECMPEdge node scalingthroughputTier-0 Gateway - Question #11Troubleshooting Methodologies and Tools
An administrator encountered a failure with one of the NSX Managers in a VCF Fleet. The administrator has successfully re-deployed an NSX Manager from SFTP backups. However, after...
NSX Managercluster statusnode removalUUID - Question #12Routine Maintenance Procedures
An administrator has a vSphere 8 Update 1a with NSX 4.1.0.2 environment. What option can the administrator use to converge this vSphere with NSX environment into a VMware Cloud Fou...
VCF convergencevSphereNSXWorkload Domain - Question #13Routine Maintenance Procedures
The administrator is implementing a multi-location VMware Cloud Foundation (VCF) environment. The design requires centralized security and networking policies across multiple VCF i...
Global ManagerSDDC ManagerNSX Federationmulti-site VCF - Question #14Routine Maintenance Procedures
An administrator has a VMware Cloud Foundation (VCF) instance. A critical NSX security update has been released by Broadcom. How can the administrator install the NSX update?
NSX updateVCF OperationsFleet Managementpatch management - Question #15Configure NSX-T Infrastructure
An administrator is preparing to deploy a new workload domain that will host vSphere Kubernetes Service (VKS) clusters. Before configuring the network for the Kubernetes clusters,...
Tier-0 GatewayVKSVPCActive/Standby mode - Question #16Configure NSX-T Infrastructure
An administrator is tasked to create a development environment with a Tier-1 gateway to host overlay segments for only East/West workload communication. North/South communication i...
Tier-1 Gatewayroute advertisementoverlay segmentsNorth/South connectivity - Question #17Configure NSX-T Infrastructure
An administrator is upgrading an existing VMware Cloud Foundation (VCF) environment. An NSX Edge Cluster is required to support north-south traffic for a workload domain. How would...
Edge ClusterVCF Fleet Managerworkload domaindeployment - Question #18Implement Network Security
Which two statements describe the recommended strategy for configuring and synchronizing security policies across Federated NSX sites? (Choose two.)
NSX FederationGlobal Managersecurity policiesDistributed Firewall - Question #19Configure NSX-T Infrastructure
An administrator must provide North/South connectivity for a VPC. The fabric exposes a distributed external VLAN across all ESX hosts. But, the only BGP peer to the core is on a VL...
VPCTransit GatewayBGPEdge Cluster - Question #20Troubleshoot NSX-T Data Center Networking
An administrator is investigating reports that several Virtual Machines (VMs) deployed on an NSX virtual network segment are dropping packets. To troubleshoot the issue the adminis...
Traceflowpacket inspectionoverlay segmentVM connectivity - Question #21Implement Network Services
When using a DHCP Relay on a segment, which design restriction must be considered?
DHCP Relaysegmentstatic bindingsdesign restriction - Question #22Manage NSX-T Data Center Operations
An administrator changed the SFTP server used for scheduled NSX Manager backups. The backup jobs now fail with the error "Host KEY Verification Failed." The connectivity and creden...
NSX backupSFTPSSH fingerprinthost key verification - Question #29Troubleshoot NSX-T Data Center Networking
In a VCF 9.0 environment, multiple workload domains share a single NSX deployment. After adding a new workload domain, overlay segments attached to an existing Tier-1 gateway fail...
workload domainTier-1 Gateway sharingVCF 9.0overlay segments - Question #30Troubleshoot NSX-T Data Center Networking
A Tier-0 gateway in Active-Active mode is configured with ECMP. Upstream TOR switches report asymmetric routing, causing intermittent firewall session drops. Which design change MO...
ECMPActive-Activeasymmetric routingstateful services - Question #31Troubleshoot NSX-T Data Center Networking
An NSX Edge node shows the following symptoms: - Management connectivity is normal - BGP neighbors are established - No north-south traffic passes - get logical-router shows interf...
Edge nodedatapath failurelogical routernorth-south traffic - Question #32Troubleshoot NSX-T Data Center Networking
An administrator has noticed an issue in a freshly deployed VMware Cloud Foundation (VCF) environment where the BGP neighborship between the Tier-0 gateway and a physical router re...
BGPIdle stateAS number mismatchTier-0 Gateway - Question #33Configure NSX-T Infrastructure
A cloud service provider runs VPCs with differing traffic patterns: - Some VPCs are generating high, large North/South flows. - Most of the VPCs generate very little traffic. The a...
Edge ClusterVPCVRFtraffic isolation - Question #34Configure NSX-T Infrastructure
A large multinational corporation is seeking proposals for the modernization of a Private Cloud environment. The proposed solution must meet the following requirements: - Support m...
NSX Federationmulti-datacentervDefendVPC - Question #35Troubleshoot NSX-T Data Center Networking
An administrator is troubleshooting why workloads in NSX cannot reach the external network 10.100.0.0/16. The Tier-0 Gateway is in Active/Active mode and has the following configur...
static routescopeActive-Activeuplink - Question #36Troubleshoot NSX-T Data Center Networking
An administrator is investigating packet loss reported by workloads connected to VLAN segments in an NSX environment. Initial checks confirm: - All VMs are powered on - VLAN segmen...
VLAN segmentpacket lossTraceflowPacket Capture - Question #37Manage NSX-T Data Center Operations
An administrator has observed an NSX Local Manager (LM) outage at the secondary Site. However, the NSX Global Manager (GM) in secondary Site remains operational. What happens to da...
NSX FederationLocal Managerdata plane resilienceoutage - Question #38Manage NSX-T Data Center Operations
An administrator has deployed a workload domain in VMware Cloud Foundation (VCF). The workload domain was deployed with NSX managers using the XL form factor. After deployment, the...
NSX Managerform factorresizeVCF deployment - Question #39Implement Network Services
An administrator is configuring Border Gateway Protocol (BGP) routing on a Tier-0 Gateway to optimize north--south traffic flow between the NSX environment and multiple upstream ph...
BGPAS-Path PrependMEDroute manipulation - Question #40Configure NSX-T Infrastructure
In a VCF 9.0 design, which NSX component is responsible for first-hop gateway availability for overlay segments?
Tier-1 GatewayDistributed Routeroverlay segmentsfirst-hop gateway - Question #41Manage NSX-T Data Center Operations
During a planned VCF upgrade, ESXi hosts are upgraded while NSX Manager and Edge nodes remain unchanged. Immediately after the ESXi upgrade, workloads lose east-west connectivity....
VCF upgradeNSX VIBsESXi upgradeeast-west connectivity - Question #42Implement Network Security
A security architect wants east-west traffic inspection AND centralized logging for compliance, without impacting workload performance. Which design BEST satisfies the requirement?
Distributed FirewallFlow Monitoringeast-west inspectioncompliance logging - Question #43Configure NSX-T Infrastructure
An administrator is configuring an NSX segment used by a nested hypervisor deployment where an ESXi VM runs on an ESXi host and multiple VMs run inside the ESXi VM. Which segment p...
MAC Discoverysegment profilenested hypervisorpromiscuous mode - Question #44Configure NSX-T Infrastructure
During a design review, the administrator is asked to explain which underlying technology enables the NSX Edge to perform fast packet processing and achieve near line-rate performa...
DPDKNSX Edgefast packet processingVNF - Question #45Configure NSX-T Infrastructure
An architect is designing a VMware Cloud Foundation (VCF) solution. The following information was gathered during the assessment phase: - There is a critical application used by th...
eBGPECMPBFDhigh availability design - Question #46Configure NSX-T Infrastructure
How should the Global Managers (GMs) and Local Managers (LMs) be distributed to ensure high availability and optimal performance in a multi-site NSX Federation deployment comprised...
NSX FederationGlobal ManagerLocal Managermulti-site deployment - Question #47Troubleshoot NSX-T Data Center Networking
An administrator is troubleshooting an issue where workloads connected to a Tier-1 Gateway named T1-App can no longer reach external North/South destinations. - The Tier-1 is conne...
MTU mismatchDR-SR communicationTier-1 troubleshootingnorth-south connectivity - Question #48Troubleshoot NSX-T Data Center Networking
An architect has just deployed a new NSX Edge cluster in a VMware Cloud Foundation (VCF) fleet. The BGP peer between the NSX Tier-0 gateway and the top-of-rack routers is successfu...
BGPdefault routetop-of-rack routernorth-south connectivity - Question #49Manage NSX-T Data Center Operations
An administrator has deployed a new VMware Cloud Foundation (VCF) management domain. To be compliant with company policy, backups must be configured to occur anytime a change is ma...
NSX backupconfiguration backupchange-triggered backupVCF management - Question #50Implement Network Services
An administrator needs to prevent the datacenter from advertising any internal prefixes toward a new VPC, while still ensuring the VPC receives a default route learned from the dat...
routing policyprefix filteringdefault routeVPC transit - Question #51Troubleshoot NSX-T Data Center Networking
When attempting to deploy or expand an edge cluster from an administrator encounters a failure: "Failed to validate the BGP Route Distribution". Prior to calling support, the admin...
BGP route distributionedge cluster deploymentTier-0 troubleshootingedge node logs - Question #52Configure NSX-T Infrastructure
Which of the following statements is true when configuring Remote Tunnel End Points (RTEPs) with NSX Federation?
RTEPNSX FederationMTUtunnel endpoint - Question #53Troubleshoot NSX-T Data Center Networking
Which failure scenario would impact north-south traffic only, while leaving east-west traffic fully operational?
NSX Edgefault isolationnorth-south vs east-westfailure impact - Question #54Configure NSX-T Infrastructure
A customer wants to use VRF-lite-like isolation for multiple tenants while sharing the same physical uplinks and Edge cluster. Which NSX construct should be used?
multi-tenancyVRF-liteTier-0 gatewaytenant isolation - Question #55Configure NSX-T Infrastructure
In a VCF 9.0 environment, an administrator enables BGP Graceful Restart on a Tier-0 gateway. - During an NSX Edge node reboot: - BGP sessions remain established - Routes stay prese...
BGP Graceful Restartcontrol planedata plane forwardingEdge failover - Question #56Troubleshoot NSX-T Data Center Networking
A workload domain uses Active-Standby Tier-0 with a single Edge cluster. After a failover event, north-south traffic resumes, but ARP entries on upstream switches remain incorrect,...
Gratuitous ARPARP table correctionActive-Standby Tier-0failover