In a VCF 9.0 environment, multiple workload domains share a single NSX deployment. After adding a new workload domain, overlay segments attached to an existing Tier-1 gateway fail to provide…

The correct answer is B. The Tier-1 gateway is not shared across workload domains. In VCF with shared NSX, Tier-1 gateways are scoped per workload domain unless explicitly shared. Even if transport nodes and TEPs are healthy, workloads in a new domain cannot use an existing Tier-1 unless it is properly attached/shared, which is a common exam trap.

Troubleshoot NSX-T Data Center Networking

Question

In a VCF 9.0 environment, multiple workload domains share a single NSX deployment. After adding a new workload domain, overlay segments attached to an existing Tier-1 gateway fail to provide connectivity for workloads in the new domain. All transport nodes show UP, and TEPs are reachable. What is the MOST likely cause?

Options

  • AThe new workload domain is missing a VLAN-backed segment
  • BThe Tier-1 gateway is not shared across workload domains
  • CThe NSX Edge Cluster is not added to the new workload domain
  • DRoute redistribution is disabled on the Tier-0 gateway

How the community answered

(20 responses)
  • A
    5% (1)
  • B
    85% (17)
  • C
    10% (2)

Explanation

In VCF with shared NSX, Tier-1 gateways are scoped per workload domain unless explicitly shared. Even if transport nodes and TEPs are healthy, workloads in a new domain cannot use an existing Tier-1 unless it is properly attached/shared, which is a common exam trap.