nerdexam
Cisco

300-810 · Question #41

Refer to the exhibit. A customer reports that after a network failure, all of the Cisco Jabber clients are not switched back to their home nodes. An engineer determines that the primary Cisco IM&P ser

The correct answer is D. Click the Fallback button in the Server Action pane. E. Set the Automatic Failover parameter in the Server Recovery Manager Service Parameters to the. When the primary IM&P node is in 'Failed Over' state after a network recovery, the correct immediate action is to click the Fallback button in the Server Action pane (D), which manually triggers the failback process to move users from the backup node back to the primary. To preve

Cisco Unified IM and Presence

Question

Refer to the exhibit. A customer reports that after a network failure, all of the Cisco Jabber clients are not switched back to their home nodes. An engineer determines that the primary Cisco IM&P server is in Failed Over state. Which two actions should be performed to bring the system back to operational state and to prevent future occurrences? (Choose two.)

Exhibit

300-810 question #41 exhibit

Options

  • AAdvise all users to re-login to their Jabber clients.
  • BConfirm that both IM&P servers are configured in the Presence Redundancy Group configuration
  • CPerform a restart of the IM&P primary server to force fallback.
  • DClick the Fallback button in the Server Action pane.
  • ESet the Automatic Failover parameter in the Server Recovery Manager Service Parameters to the

How the community answered

(26 responses)
  • A
    4% (1)
  • B
    8% (2)
  • C
    12% (3)
  • D
    77% (20)

Explanation

When the primary IM&P node is in 'Failed Over' state after a network recovery, the correct immediate action is to click the Fallback button in the Server Action pane (D), which manually triggers the failback process to move users from the backup node back to the primary. To prevent this manual intervention in the future, the engineer should enable the Automatic Fallback parameter in the Server Recovery Manager Service Parameters (E), which causes IM&P to automatically return users to their home node once the primary recovers. Advising users to re-login (A) does not address the failback - users remain on the backup node. Confirming redundancy group configuration (B) is a pre-deployment check, not a recovery action. Restarting the primary server (C) would disrupt service and is not the correct fallback mechanism.

Topics

#IM&P Server Redundancy#Failover/Failback#Cisco Jabber#Server Recovery Manager

Community Discussion

No community discussion yet for this question.

Full 300-810 Practice