Cisco
300-625 · Question #20
300-625 Question #20: Real Exam Question with Answer & Explanation
Sign in or unlock 300-625 to reveal the answer and full explanation for question #20. The question stem and answer options stay visible for context.
Question
A storage administrator is connecting two previously configured switches to make a single fabric. When the E Ports are connected, the administrator sees a ZONE MERGE FAILURE message referring to the zoneset for VSAN 10 on each switch. Which command should the administrator use to allow these switches to work together?
Options
- Azoneset import interface fc1/1 vsan 10
- Bzoneset distribute full vsan 10
- Czoneset overwrite-control vsan 10
- Dzoneset copy active-zoneset full-zoneset
Unlock 300-625 to see the answer
You've previewed enough free 300-625 questions. Unlock 300-625 for full answers, explanations, the timed quiz mode, progress tracking, and the master PDF. Question stem and options stay visible so you can still see what's on the exam.