300-620 · Question #293
An endpoint called EP1 is connected to Cisco ACI compute leaf1. The engineer must replace EP1 with EP2 on the same leaf switch. Which set of actions forces all remote leaves to delete EP1 before timer
Sign in or unlock 300-620 to reveal the answer and full explanation for question #293. The question stem and answer options stay visible for context.
ACI Packet Forwarding
Question
An endpoint called EP1 is connected to Cisco ACI compute leaf1. The engineer must replace EP1 with EP2 on the same leaf switch. Which set of actions forces all remote leaves to delete EP1 before timer expiration?
Options
- ASet L2 Unknown Unicast to Hardware proxy.
- BSet L2 Unknown Unicast to Flood.
- CSet L2 Unknown Unicast to Hardware Proxy.
- DSet L2 Unknown Unicast to Flood.
Unlock 300-620 to see the answer
You've previewed enough free 300-620 questions. Unlock 300-620 for full answers, explanations, the timed quiz mode, progress tracking, and the master PDF. Question stem and options stay visible so you can still see what's on the exam.
Topics
#endpoint learning#endpoint retention#L2 Unknown Unicast#Bridge Domain