Cisco
300-610 · Question #284
300-610 Question #284: Real Exam Question with Answer & Explanation
Sign in or unlock 300-610 to reveal the answer and full explanation for question #284. The question stem and answer options stay visible for context.
Question
Refer to the exhibit. A Cisco engineer is configuring a Cisco UCS integrated infrastructure for SAP HANA that consists of 8 x Cisco UCS B/C480-M5 servers for SAP HANA and 4 x Cisco UCS C240-M5 C-Series rack mount servers for storage. The rack servers are equipped with Cisco VIC 1225T. The engineer plans to install RHEL8, but the boot process is interrupted at installation because the iSCSI LUNs are not recognized by the VIC adapter. After proper investigation, the engineer concludes that the initiator and target configuration that is programmed on the primary iSCSI VNIC to the operating system is missing. What is the reason for the issue?
Exhibit
Options
- AThe storage system is not reachable
- BThe network interfaces are not configured
- CThe Linux ISO image is not Cisco approved
- DThe boot parameter ip=ibft is not set
Unlock 300-610 to see the answer
You've previewed enough free 300-610 questions. Unlock 300-610 for full answers, explanations, the timed quiz mode, progress tracking, and the master PDF. Question stem and options stay visible so you can still see what's on the exam.
