Refer to the exhibit. Due to power limitations at the customer data center, the engineering team must decommission one of the modular switches. In the new design, the customer must ensure that the OSP

The correct answer is B. graceful restart. Graceful restart allows the OSPF process to continue forwarding packets and maintain adjacencies temporarily during a supervisor or module restart. This fits the requirement to minimize OSPF flapping on the single modular switch in the new It protects routing continuity during th

Network Design

Question

Refer to the exhibit. Due to power limitations at the customer data center, the engineering team must decommission one of the modular switches. In the new design, the customer must ensure that the OSPF process is fully protected on the remaining switch and minimize OSPF flapping in case of any module failure. Which solution fulfills the requirements for the new design?

Exhibit

300-610 question #209 exhibit

Options

  • Arouting summarization
  • Bgraceful restart
  • COSPF area separation
  • DLSA aging timer change

How the community answered

(50 responses)
  • A
    4% (2)
  • B
    88% (44)
  • C
    6% (3)
  • D
    2% (1)

Explanation

Graceful restart allows the OSPF process to continue forwarding packets and maintain adjacencies temporarily during a supervisor or module restart. This fits the requirement to minimize OSPF flapping on the single modular switch in the new It protects routing continuity during the failover of modules or supervisor changes inside the