nerdexam
Cisco

300-610 · Question #166

A Cisco UCS chassis with several blade servers, a pair of IOMs, and a pair of Cisco UCS Fabric Interconnects are installed in a data center. Which two high-availability architectures are recommended b

The correct answer is B. IOM is connected to the fabric interconnect that is acting as fabric A, and IOM B is connected to C. Any combination of one to eight links are supported to be used between each IOM and fabric. For high-availability between Cisco UCS IOMs and Fabric Interconnects, it is recommended to connect IOM A to Fabric Interconnect A and IOM B to Fabric Interconnect B, utilizing any combination of one to eight links between each IOM and its respective Fabric Interconnect.

Compute Design

Question

A Cisco UCS chassis with several blade servers, a pair of IOMs, and a pair of Cisco UCS Fabric Interconnects are installed in a data center. Which two high-availability architectures are recommended between the IOMs and fabric interconnects? (Choose two.)

Options

  • AOne, two, four and eight links are supported to be used between each IOM and fabric
  • BIOM is connected to the fabric interconnect that is acting as fabric A, and IOM B is connected to
  • CAny combination of one to eight links are supported to be used between each IOM and fabric
  • DThe IOMs are connected with multiple straight and cross-connect links toward a pair of
  • EStraight and cross-connect links should be used between the IOMs and fabric interconnects to

How the community answered

(28 responses)
  • A
    7% (2)
  • B
    75% (21)
  • D
    14% (4)
  • E
    4% (1)

Why each option

For high-availability between Cisco UCS IOMs and Fabric Interconnects, it is recommended to connect IOM A to Fabric Interconnect A and IOM B to Fabric Interconnect B, utilizing any combination of one to eight links between each IOM and its respective Fabric Interconnect.

AOne, two, four and eight links are supported to be used between each IOM and fabric

While one, two, four, and eight links are supported, stating it this way is less comprehensive than 'Any combination of one to eight links' and does not explicitly describe the recommended HA architecture regarding which IOM connects to which FI.

BIOM is connected to the fabric interconnect that is acting as fabric A, and IOM B is connected toCorrect

In a standard high-availability Cisco UCS design, IOM A (Input/Output Module) within the chassis connects exclusively to Fabric Interconnect A, and IOM B connects exclusively to Fabric Interconnect B, ensuring isolated fault domains and redundancy.

CAny combination of one to eight links are supported to be used between each IOM and fabricCorrect

Cisco UCS supports flexible port aggregation between each IOM and its respective Fabric Interconnect, allowing for any combination of one to eight 10 Gigabit Ethernet links (or higher speed depending on hardware) to be used, providing scalable bandwidth and redundancy.

DThe IOMs are connected with multiple straight and cross-connect links toward a pair of

Connecting IOMs with 'multiple straight and cross-connect links' is an invalid or unsupported cabling model in UCS; cross-connecting IOMs (e.g., IOM A to FI B) is explicitly forbidden and breaks the UCS HA domain model.

EStraight and cross-connect links should be used between the IOMs and fabric interconnects to

'Straight and cross-connect links' is incorrect because only straight-through connections (IOM A to FI A, IOM B to FI B) are used; cross-connects between IOMs and FIs would lead to an unsupported configuration.

Concept tested: Cisco UCS IOM to Fabric Interconnect Cabling and HA

Source: https://www.cisco.com/c/en/us/td/docs/unified_computing/ucs/hw/install/chassis/320M3/install_ch_ucs2100_ucs5108.html

Topics

#Cisco UCS#IOM#Fabric Interconnect#high availability

Community Discussion

No community discussion yet for this question.

Full 300-610 Practice