Question

Refer to the exhibit. The indicated configuration was applied to a Cisco switch Switch_A located in the Los Angeles DC data center; however, Switch_A fails to establish OTV connectivity to Cisco switch Switch_C. Which overlay interface command must be run on Switch_A to resolve the issue?

Exhibit

300-540 question #36 exhibit

Options

  • Aotv extend-vlan 101-111
  • Botv isis authentication-type md5
  • Cotv isis authentication-check
  • Dotv join-interface vlan 101-111

Unlock 300-540 to see the answer

You've previewed enough free 300-540 questions. Unlock 300-540 for full answers, explanations, the timed quiz mode, progress tracking, and the master PDF. Question stem and options stay visible so you can still see what's on the exam.