nerdexam
Exams300-430Questions#165
Cisco

300-430 · Question #165

300-430 Question #165: Real Exam Question with Answer & Explanation

Sign in or unlock 300-430 to reveal the answer and full explanation for question #165. The question stem and answer options stay visible for context.

Question

A corporation has employees working from their homes. A wireless engineer must connect 1810 OEAP at remote teleworker locations. All configuration has been completed on the controller side, but the network readiness is pending. Which two configurations must be performed on the firewall to allow the AP to join the controller? (Choose two.)

Options

  • ABlock UDP ports 1812 and 1813 on the firewall.
  • BAllow UDP ports 5246 and UDP port 5247 on the firewall.
  • CAllow UDP ports 12222 and 12223 on the firewall.
  • DEnable NAT Address on the 5520 with an Internet-routable IP address.
  • EConfigure a static IP on the OEAP 1810.

Unlock 300-430 to see the answer

You've previewed enough free 300-430 questions. Unlock 300-430 for full answers, explanations, the timed quiz mode, progress tracking, and the master PDF. Question stem and options stay visible so you can still see what's on the exam.

Full 300-430 Practice