Cisco
300-425 · Question #340
300-425 Question #340: Real Exam Question with Answer & Explanation
Sign in or unlock 300-425 to reveal the answer and full explanation for question #340. The question stem and answer options stay visible for context.
Question
A customer has two locations named building 1 and building 2. Each location has a Cisco wireless network with these components: Building 1 - 2 Cisco Catalyst 9800 Series Wireless Controllers in a high availability cluster - 50 Cisco Catalyst 9100 APs - Contractor SSID in VLAN 100 - Corporate SSID in VLAN 200 - mobility group configured to the building 2 WLCs Building 2 - 2 Cisco Catalyst 9800 Series Wireless Controllers in a high availability cluster - 20 Cisco Catalyst 9100 APs - Contractor SSID in VLAN 300 - Corporate SSID in VLAN 400 - mobility group configured to the building 1 WLCs The customer has a new security requirement mandating that all contractor SSID traffic must terminate on VLAN 100 on the building 1 WLCs for all locations. Which design approach must the engineer take?
Options
- AUse the building 2 WLCs as foreign controllers and building 1 as anchor controllers for the
- BUse the WLCs at both buildings as foreign controllers and tunnel the contractor SSID traffic to
- CUse the building 2 WLCs as anchor controllers and building 1 as foreign controllers for the
- DUse the WLCs at both buildings as anchor controllers and tunnel the contractor SSID traffic to
Unlock 300-425 to see the answer
You've previewed enough free 300-425 questions. Unlock 300-425 for full answers, explanations, the timed quiz mode, progress tracking, and the master PDF. Question stem and options stay visible so you can still see what's on the exam.