Cisco
300-425 · Question #109
300-425 Question #109: Real Exam Question with Answer & Explanation
Sign in or unlock 300-425 to reveal the answer and full explanation for question #109. The question stem and answer options stay visible for context.
Question
An engineer must perform an assessment of a customer LAN for a future IEEE 802.11 ac Wave 2 wireless deployment. All access switches are Fast Ethernet-capable only, and the wired infrastructure between existing APs and access switches is based on the CAT 6A standard. Which two actions provide maximum support of Cisco 3800 Series access points? (Choose two)
Options
- AReplace the existing switches with gigabit switches with 10 G uplinks.
- BEnsure that cable distances between access switches and APs are not longer than 55 meters.
- CReplace the existing wiring infrastructure with the CAT-7E wiring standard.
- DReplace the existing switches with mGig switches.
- EEnsure that cable distances between access switches and APs are not longer than 100
Unlock 300-425 to see the answer
You've previewed enough free 300-425 questions. Unlock 300-425 for full answers, explanations, the timed quiz mode, progress tracking, and the master PDF. Question stem and options stay visible so you can still see what's on the exam.