Cisco
300-425 · Question #200
300-425 Question #200: Real Exam Question with Answer & Explanation
Sign in or unlock 300-425 to reveal the answer and full explanation for question #200. The question stem and answer options stay visible for context.
Question
A network engineer must design a new wireless solution for a company, but the budget can only stretch to include a single Cisco 9800-40 WLC. The company requires high availability between the WLC and the core switch in the event of a cable failure. The WLC must dynamically manage port redundancy and perform load balancing between APs transparently. Which design approach must the engineer take to meet the requirements?
Options
- ALAG
- BMulti-LAG
- CLACP
- DPAgP
Unlock 300-425 to see the answer
You've previewed enough free 300-425 questions. Unlock 300-425 for full answers, explanations, the timed quiz mode, progress tracking, and the master PDF. Question stem and options stay visible so you can still see what's on the exam.