nerdexam
Broadcom-VMware

2V0-21.23 · Question #17

An administrator creates a new corporate virtual machine (VM) template every month to include all of the latest patches. The administrator needs to ensure that the new VM template is synchronized from

Sign in or unlock 2V0-21.23 to reveal the answer and full explanation for question #17. The question stem and answer options stay visible for context.

Planning and Designing

Question

An administrator creates a new corporate virtual machine (VM) template every month to include all of the latest patches. The administrator needs to ensure that the new VM template is synchronized from the primary data center site (London) to two secondary data center sites (Tokyo and New York). The administrator is aware that datastore space is limited within the secondary data center sites. The administrator needs to ensure that the VM template is available in the secondary sites the first time a new virtual machine is requested. Which four steps should the administrator take to meet these requirements? (Choose four.)

Options

  • ACreate a new published content library at the primary site.
  • BAdd the virtual machine template to the subscribed content library.
  • CCreate a new published content library in each secondary site.
  • DCreate a new subscribed content library in each secondary site.
  • EConfigure the subscribed content library to download content when needed.
  • FConfigure each subscribed content library to download content immediately.
  • GAdd the virtual machine template to the published content library.

Unlock 2V0-21.23 to see the answer

You've previewed enough free 2V0-21.23 questions. Unlock 2V0-21.23 for full answers, explanations, the timed quiz mode, progress tracking, and the master PDF. Question stem and options stay visible so you can still see what's on the exam.

Topics

#Content Library#Published Library#Subscribed Library#Content Synchronization#Storage Optimization
Full 2V0-21.23 Practice