Two technicians are required to move a Tower CPU, 21 inch CRT, and a network laser printer from one side of a warehouse to the other. The warehouse floor is damaged, and uneven. Which of the…

The correct answer is D. Secure the equipment one at a time to a cart or dolly. See the full explanation below for the reasoning.

Question

Two technicians are required to move a Tower CPU, 21 inch CRT, and a network laser printer from one side of a warehouse to the other. The warehouse floor is damaged, and uneven. Which of the following is a BEST practice when moving the equipment?

Options

  • AMove the equipment on a metal cart to prevent ESD damage.
  • BHave one technician carry the equipment while the other calls out the hazards.
  • CHave both technicians walk side by side when carrying the equipment.
  • DSecure the equipment one at a time to a cart or dolly.

How the community answered

(41 responses)
  • A
    15% (6)
  • B
    7% (3)
  • C
    2% (1)
  • D
    76% (31)