Question
An engineer is deploying a Cisco TelePresence Touch 8 controller for a Cisco TelePresence SX20. Which two steps are required as part of this process? (Choose two.)
Options
- AConnect the cable from the Touch 8 controller to the Cisco TelePresence SX20.
- BConnect the Touch 8 controller to the power adapter and connect the adapter to the network.
- CConnect the Touch 8 controller to the secondary network adapter on the Cisco TelePresence
- DReboot the Cisco TelePresence SX20.
- EHold the mute button down for 20 seconds while you power on the Touch 8 controller.
Unlock 210-065 to see the answer
You've previewed enough free 210-065 questions. Unlock 210-065 for full answers, explanations, the timed quiz mode, progress tracking, and the master PDF. Question stem and options stay visible so you can still see what's on the exam.