Which three pieces of information must be maintained for all stakeholders as part of the change management process? (Choose three.)

The correct answer is B. the date and time that the change was applied and on which device C. the original change request form that indicates why the change is necessary E. a description of the actual change itself (configuration, program code, and so on). Effective change management requires a traceable audit trail, which is why B (timestamp and affected device), C (the original request justifying the change), and E (a description of what was actually changed) are the three essentials - together they answer when/where, why, and…

Perform Industrial Network Maintenance

Question

Which three pieces of information must be maintained for all stakeholders as part of the change management process? (Choose three.)

Options

  • Athe location of the person who applied the change
  • Bthe date and time that the change was applied and on which device
  • Cthe original change request form that indicates why the change is necessary
  • Dthe size of the change (in bytes)
  • Ea description of the actual change itself (configuration, program code, and so on)
  • Fthe names of the current members of the change advisory board
  • Gthe industrial protocol that is used

How the community answered

(46 responses)
  • A
    2% (1)
  • B
    72% (33)
  • D
    7% (3)
  • F
    15% (7)
  • G
    4% (2)

Explanation

Effective change management requires a traceable audit trail, which is why B (timestamp and affected device), C (the original request justifying the change), and E (a description of what was actually changed) are the three essentials - together they answer when/where, why, and what for every change.

The distractors fail because A (the applier's physical location) is irrelevant to auditing a change - who applied it may matter, but not where they were sitting. D (size in bytes) is a technical metric with no inherent change management value. F (current CAB membership) describes the governance body, not the change record itself - that information belongs in the organization chart, not the change log. G (industrial protocol) is too narrow and context-specific to be a universal requirement.

Memory tip: Think of the three answers as the journalism core - When/Where (B), Why (C), and What (E). Every change record must tell a future auditor those three things without ambiguity.

Topics

#change management#documentation#stakeholder communication#audit trails