The customer uses the Rate Schedule Program to add a Rate Schedule. Which three selections does the system verify?
The correct answer is A. The Branch/Plant Constants have been created. C. The dates appear in the appropriate shop floor calendar. E. The item is a lot-controlled item. See the full explanation below for the reasoning.
Question
The customer uses the Rate Schedule Program to add a Rate Schedule. Which three selections does the system verify?
Options
- AThe Branch/Plant Constants have been created.
- BThe line exists in the Line/Item Relationship Master.
- CThe dates appear in the appropriate shop floor calendar.
- DThe effective date ranges are within the defined period.
- EThe item is a lot-controlled item.
How the community answered
(49 responses)- A76% (37)
- B8% (4)
- D16% (8)