The customer uses the Rate Schedule Program to add a Rate Schedule. Which three selections does the system verify?

The correct answer is A. The Branch/Plant Constants have been created. C. The dates appear in the appropriate shop floor calendar. E. The item is a lot-controlled item. See the full explanation below for the reasoning.

Question

The customer uses the Rate Schedule Program to add a Rate Schedule. Which three selections does the system verify?

Options

  • AThe Branch/Plant Constants have been created.
  • BThe line exists in the Line/Item Relationship Master.
  • CThe dates appear in the appropriate shop floor calendar.
  • DThe effective date ranges are within the defined period.
  • EThe item is a lot-controlled item.

How the community answered

(49 responses)
  • A
    76% (37)
  • B
    8% (4)
  • D
    16% (8)

Community Discussion