nerdexam
Oracle

1Z0-068 · Question #129

1Z0-068 Question #129: Real Exam Question with Answer & Explanation

Sign in or unlock 1Z0-068 to reveal the answer and full explanation for question #129. The question stem and answer options stay visible for context.

Question

You must deploy several Oracle 12c databases on an Oracle Grid Infrastructure Managed Cluster, and are required to have the ability to perform these actions without down time: 1. Apply a Grid Infrastructure interim patch. 2. Apply a Grid Infrastructure Patch Set Update (PSU). 3. Apply a database on-line patch. 4. Apply a Grid Infrastructure patchset. 5. Apply a database patchset. 6. Upgrade Grid Infrastructure from one release to another. 7. Upgrade databases from one release to another. Your plan is to perform these tasks: 1. Install and configure Oracle Grid Infrastructure on a local file system. 2. Install Oracle Database software on an ACFS file system. 3. Create several RAC One Node databases. Which of the 7 requirements are met by your plan?

Options

  • A1, 2, 3, 4, 5, 6 and 7.
  • B1, 2, 3, 4 and 6.
  • C1, 2, 3, 4, 5 and 6.
  • D1, 2, 3 and 4.
  • E2, 3, 4 and 6.
  • F2, 3, 4, 5 and 6.

Unlock 1Z0-068 to see the answer

You've previewed enough free 1Z0-068 questions. Unlock 1Z0-068 for full answers, explanations, the timed quiz mode, progress tracking, and the master PDF. Question stem and options stay visible so you can still see what's on the exam.

Full 1Z0-068 Practice