nerdexam
Brocade

143-085 · Question #28

You need to deploy FC-FC routing between two Gen 5 edge fabrics across an FCIP link. Each edge fabric contains a single Brocade 6520 switch. Your backbone fabric consists of two Brocade 7800…

The correct answer is D. Configure VE_Ports between the 7800s and E_Ports on each edge fabric connecting to EX_Ports. See the full explanation below for the reasoning.

Question

You need to deploy FC-FC routing between two Gen 5 edge fabrics across an FCIP link. Each edge fabric contains a single Brocade 6520 switch. Your backbone fabric consists of two Brocade 7800 Extension Switches. How do you enable FC-FC routing using FCIP?

Options

  • AConfigure E_Ports between the 7800s and VE_Ports on each edge fabric connecting to EX_Ports
  • BConfigure VE_Ports between the 7800s and VE_Ports on each edge fabric connecting to
  • CConfigure VEX_Ports between the 7800s and E_Ports on each edge fabric connecting to
  • DConfigure VE_Ports between the 7800s and E_Ports on each edge fabric connecting to EX_Ports

How the community answered

(43 responses)
  • A
    19% (8)
  • B
    7% (3)
  • C
    2% (1)
  • D
    72% (31)

Community Discussion

No community discussion yet for this question.

Full 143-085 Practice