Brocade
143-085 · Question #26
143-085 Question #26: Real Exam Question with Answer & Explanation
Sign in or unlock 143-085 to reveal the answer and full explanation for question #26. The question stem and answer options stay visible for context.
Question
You need to implement FC routing in your Gen 5 fabric. The backbone fabric will contain a factory default Brocade 7800 Extension Switch and a Brocade DCX 8510-8 with two FC16-32 blades. VEX_Port connectivity to the edge fabrics will be needed in the final configuration. Which two statements describe how to enable the final configuration? (Choose two.)
Options
- AAn Integrated Routing license must be installed on the Brocade 7800 Extension Switch.
- BLSAN zones must be configured in the backbone.
- CVEX_Ports must be configured on the Brocade DCX 8510-8.
- DVEX_Ports must be configured on the Brocade 7800 Extension Switch.
Unlock 143-085 to see the answer
You've previewed enough free 143-085 questions. Unlock 143-085 for full answers, explanations, the timed quiz mode, progress tracking, and the master PDF. Question stem and options stay visible so you can still see what's on the exam.