Brocade
143-085 · Question #20
Refer to the exhibit. Referring to the exhibit, which two statements are true regarding FC-FC routing? (Choose two.)
The correct answer is B. Switch 3 can have a maximum of two translate domains. D. Switch 1 and Switch 4 fabric IDs must match. See the full explanation below for the reasoning.
Question
Refer to the exhibit. Referring to the exhibit, which two statements are true regarding FC-FC routing? (Choose two.)
Exhibit
Options
- ASwitch 3 can have a maximum of two front domains.
- BSwitch 3 can have a maximum of two translate domains.
- CLSAN zones on Switch 2 and Switch 3 must have the same name.
- DSwitch 1 and Switch 4 fabric IDs must match.
How the community answered
(36 responses)- A14% (5)
- B78% (28)
- C8% (3)
Community Discussion