Veeam
VMCE_V12 · Question #20
VMCE_V12 Question #20: Real Exam Question with Answer & Explanation
Sign in or unlock VMCE_V12 to reveal the answer and full explanation for question #20. The question stem and answer options stay visible for context.
Question
The engineer configured Veeam Backup & Replications 3 years ago with an all-in-one physical server with one job backing up all VMs. The environment grew considerably and RPOs are no longer met. The engineer checks the backup job and sees: Load: Source 0% > Proxy 68% > Network 0% > Target 0%. What should be done to decrease the backup processing time?
Options
- AEdit the Backup Job settings and enable parallel processing from Advanced options
- BSplit the VMs in several jobs with the same schedule to process the VMs in parade
- CFrom Backup Infrastructure add an extra Windows/Linux machine as Backup Proxy
- DInstall another Veeam Backup & Replication server and move half of the VMs to be processed in
Unlock VMCE_V12 to see the answer
You've previewed enough free VMCE_V12 questions. Unlock VMCE_V12 for full answers, explanations, the timed quiz mode, progress tracking, and the master PDF. Question stem and options stay visible so you can still see what's on the exam.