nerdexam
Veeam

VMCE_V12 · Question #20

VMCE_V12 Question #20: Real Exam Question with Answer & Explanation

Sign in or unlock VMCE_V12 to reveal the answer and full explanation for question #20. The question stem and answer options stay visible for context.

Question

The engineer configured Veeam Backup & Replications 3 years ago with an all-in-one physical server with one job backing up all VMs. The environment grew considerably and RPOs are no longer met. The engineer checks the backup job and sees: Load: Source 0% > Proxy 68% > Network 0% > Target 0%. What should be done to decrease the backup processing time?

Options

  • AEdit the Backup Job settings and enable parallel processing from Advanced options
  • BSplit the VMs in several jobs with the same schedule to process the VMs in parade
  • CFrom Backup Infrastructure add an extra Windows/Linux machine as Backup Proxy
  • DInstall another Veeam Backup & Replication server and move half of the VMs to be processed in

Unlock VMCE_V12 to see the answer

You've previewed enough free VMCE_V12 questions. Unlock VMCE_V12 for full answers, explanations, the timed quiz mode, progress tracking, and the master PDF. Question stem and options stay visible so you can still see what's on the exam.

Full VMCE_V12 Practice