Veeam
VMCE_V10 · Question #255
A company needs to maintain and verify backups at a secondary site to meet the following requirements: RTO of two hours, RPO of 12 hours, four weeks retention. Which of the following backup copy job…
The correct answer is C. Periodic backup copy job, scheduled for a two-hour interval, with 112 restore points to retain. See the full explanation below for the reasoning.
Question
A company needs to maintain and verify backups at a secondary site to meet the following requirements: RTO of two hours, RPO of 12 hours, four weeks retention. Which of the following backup copy job configurations meets these requirements?
Options
- APeriodic backup copy job, scheduled for a two-hour interval, with 56 restore points to retain
- BPeriodic backup copy job, scheduled for a 12-hour interval, with 56 restore points to retain
- CPeriodic backup copy job, scheduled for a two-hour interval, with 112 restore points to retain
- DPeriodic backup copy job, scheduled for a 12-hour interval, with 112 restore points to retain
How the community answered
(28 responses)- A4% (1)
- B14% (4)
- C79% (22)
- D4% (1)
Community Discussion
No community discussion yet for this question.