When should you consider disabling multithreaded data transfer?

The correct answer is A. When severaljobs are scheduled to run at the same time. Schedule several jobs to run at the same time.

Configuration

Question

When should you consider disabling multithreaded data transfer?

Options

  • AWhen severaljobs are scheduled to run at the same time
  • BWhen the simple deployment scenario is used
  • CWhen the backup traffic needs to be routed over a non-production network
  • DWhen it is required to keep production storage availability from being impacted by the load from

How the community answered

(61 responses)
  • A
    79% (48)
  • B
    7% (4)
  • C
    3% (2)
  • D
    11% (7)

Explanation

Schedule several jobs to run at the same time.

Topics

#multithreaded data transfer#concurrent jobs#backup performance#resource contention