VMCE2021 · Question #189
When should you consider disabling multithreaded data transfer?
The correct answer is A. When severaljobs are scheduled to run at the same time. Schedule several jobs to run at the same time.
Configuration
Question
When should you consider disabling multithreaded data transfer?
Options
- AWhen severaljobs are scheduled to run at the same time
- BWhen the simple deployment scenario is used
- CWhen the backup traffic needs to be routed over a non-production network
- DWhen it is required to keep production storage availability from being impacted by the load from
How the community answered
(55 responses)- A73% (40)
- B4% (2)
- C9% (5)
- D15% (8)
Explanation
Schedule several jobs to run at the same time.
Topics
#multithreaded data transfer#job scheduling#performance tuning