A vSphere Standard Switch has been configured for IP-based load balancing using two uplinks. A new uplink is added to the vswitch. What additional configuration is required by default?
The correct answer is C. The physical switch must add the new port to the existing 802.3ad group. See the full explanation below for the reasoning.
Question
A vSphere Standard Switch has been configured for IP-based load balancing using two uplinks. A new uplink is added to the vswitch. What additional configuration is required by default?
Options
- AThe uplink is placed in standby mode until it is added to the active NIC team.
- BThe uplink is considered active, but it will not participate in the active NIC team until assigned to
- CThe physical switch must add the new port to the existing 802.3ad group.
- DThe uplink is automatically marked as unused when it is added to IP-based NIC team.
How the community answered
(45 responses)- A7% (3)
- B13% (6)
- C78% (35)
- D2% (1)