SY0-701 · Question #417

During an annual review of the system design, an engineer identified a few issues with the currently released design. Which of the following should be performed next according to best practices?

The correct answer is D. Change control process. Change control process: The change control process ensures that any modifications to the design are systematically evaluated, approved, and documented. This helps in maintaining the integrity of the system and ensures that changes are implemented in a controlled and coordinated

Submitted by skyler.x· Mar 6, 2026Security program management and oversight

Question

During an annual review of the system design, an engineer identified a few issues with the currently released design. Which of the following should be performed next according to best practices?

Options

  • ARisk management process
  • BProduct design process
  • CDesign review process
  • DChange control process

How the community answered

(20 responses)
  • A
    5% (1)
  • B
    5% (1)
  • C
    15% (3)
  • D
    75% (15)

Explanation

Change control process: The change control process ensures that any modifications to the design are systematically evaluated, approved, and documented. This helps in maintaining the integrity of the system and ensures that changes are implemented in a controlled and coordinated