SIMULATION 2 A recent power outage caused email services to go down. A server administrator also received averts from the datacenter's UPS. After some investigation, the server administrator learned…
The simulation describes a power outage, resulting in email service disruption and UPS alerts due to PDU over-consumption, requiring power redundancy and PDU load management to ensure maximum consumption does not exceed 9.6A.
Question
SIMULATION 2 A recent power outage caused email services to go down. A server administrator also received averts from the datacenter's UPS. After some investigation, the server administrator learned that each PDU was rated at a maximum of 12A. Instructions Ensure power redundancy is implemented throughout each rack and UPS alarms are resolved. Ensure the maximum potential PDU consumption does not exceed 80% (or 9.6A).
Exhibits
Options
- APDU selections must be changed using the penal icon.
- BVM Hosts 1 and 2 and Mall Relay can be moved between racks.
- CCertain devices contain additional details.
Why each option
The simulation describes a power outage, resulting in email service disruption and UPS alerts due to PDU over-consumption, requiring power redundancy and PDU load management to ensure maximum consumption does not exceed 9.6A.
Concept tested: Power redundancy and PDU load management