When preparing to merge two fabrics, which two items should be checked before connecting the fabrics? (Choose Two.)

The correct answer is B. timeout values are set properly E. interoperability modes are configured per vendor instructions. See the full explanation below for the reasoning.

Question

When preparing to merge two fabrics, which two items should be checked before connecting the fabrics? (Choose Two.)

Options

  • Azones sets are activated
  • Btimeout values are set properly
  • Cnew configurations are enabled to allow the merge
  • Dfabrics are co-located to prevent segmentation
  • Einteroperability modes are configured per vendor instructions

How the community answered

(27 responses)
  • A
    4% (1)
  • B
    81% (22)
  • C
    4% (1)
  • D
    11% (3)

Community Discussion