Exhibit: In this future marina layout, assuming that there are fewer than 10 slips being cabled, what would be the pre-cabling guideline to follow for terminal A?

The correct answer is A. Installed one or two pair cables from the boat slips to a distribution terminal on the closest point of. Option A correctly describes the pre-cabling guideline for small marina installations with fewer than 10 slips: running one or two pair cables directly from each boat slip to a distribution terminal at the nearest point on the dock. This direct, point-to-point approach is…

Telecommunications Infrastructure and Structured Cabling Design

Question

Exhibit:

In this future marina layout, assuming that there are fewer than 10 slips being cabled, what would be the pre-cabling guideline to follow for terminal A?

Exhibit

RCDDV15 question #295 exhibit

Options

  • AInstalled one or two pair cables from the boat slips to a distribution terminal on the closest point of
  • BPlace distribution cable onto the dock and terminate in a suitable cabinet or enclosure. Install
  • CPre-cable each boat slip during construction.
  • DFor security, each install should be terminated in the patch panel/cross-connect at the

How the community answered

(40 responses)
  • A
    80% (32)
  • B
    10% (4)
  • C
    3% (1)
  • D
    8% (3)

Explanation

Option A correctly describes the pre-cabling guideline for small marina installations with fewer than 10 slips: running one or two pair cables directly from each boat slip to a distribution terminal at the nearest point on the dock. This direct, point-to-point approach is appropriate at this scale because the low slip count doesn't justify the added infrastructure complexity of larger distribution systems.

Option B is wrong because placing a full distribution cable along the dock with a cabinet/enclosure is the approach for larger installations where aggregating many connections is necessary - overkill for under 10 slips. Option C is a general construction best practice (pre-cable during build), but it doesn't answer how to cable terminal A specifically - it describes timing, not topology. Option D is incorrect because routing each connection back to a central patch panel/cross-connect applies to larger, more complex deployments where centralized management and security justify the extra runs; for fewer than 10 slips, it's unnecessarily complex.

Memory tip: Think "small = simple, direct shot." Fewer than 10 slips → run pairs straight to the nearest terminal (A). Bigger marina → distribution cables, cabinets, and patch panels.

Topics

#structured-cabling#distribution-design#marina-infrastructure#cable-routing