RCDDV15 · Question #293
Exhibit: In this future marina layout, what would be the pre-cabling guideline to follow for the terminal A?
The correct answer is A. Place distribution cable onto the dock and terminate in a suitable cabinet or enclosure. Run. See the full explanation below for the reasoning.
Outside Plant – Special Environments (Marina/Waterfront)
Question
Exhibit:
In this future marina layout, what would be the pre-cabling guideline to follow for the terminal A?
Exhibit
Options
- APlace distribution cable onto the dock and terminate in a suitable cabinet or enclosure. Run
- BProvide one or two pair cables from the boat slips to a distribution terminal on the closest point of
- CPre-cable each boat slip during construction.
- DFor security, each run should be terminated in the patch panel/ cross-connect at the dockmaster
How the community answered
(25 responses)- A72% (18)
- B4% (1)
- C8% (2)
- D16% (4)
Topics
#marina outside plant#distribution cable#pre-cabling guidelines#special environments