You have been selected to do the telecommunications design on a new, single story building. The architect requires the size and location of the telecommunications rooms so their building design can…

The correct answer is B. Determine the number of , their locations, and telecommunications services needed. See the full explanation below for the reasoning.

Question

You have been selected to do the telecommunications design on a new, single story building. The architect requires the size and location of the telecommunications rooms so their building design can proceed. From the items listed below (all of which are required for the design), which one is the logical starting point in order to provide the architect with a size and location for the room?

Options

  • ADetermine where the entrance facility will be
  • BDetermine the number of , their locations, and telecommunications services needed
  • CDetermine the power, HVAC, electrical, and security requirements for the room
  • DDetermine future growth and other requirements
  • EDetermine the types of equipment to be installed in the room

How the community answered

(21 responses)
  • A
    10% (2)
  • B
    81% (17)
  • C
    5% (1)
  • D
    5% (1)