In this future marina layout, what would be the pre-cabling guideline to follow for the terminal A?
The correct answer is A. Place distribution cable onto the dock and terminate in a suitable cabinet or enclosure. See the full explanation below for the reasoning.
Question
In this future marina layout, what would be the pre-cabling guideline to follow for the terminal A?
Exhibit
Options
- APlace distribution cable onto the dock and terminate in a suitable cabinet or enclosure.
- BProvide one or two pair cables from the boat slips to a distribution terminal on the closest point of land.
- CPre-cable each boat slip during construction.
- DFor security, each run should be terminated in the patch panel/ cross-connect at the dockmaster or
How the community answered
(15 responses)- A87% (13)
- B7% (1)
- D7% (1)